Pool Construction in St. John, USVI

As a pool contractor on St. John, we know the island represents some of the most technically challenging aquatic construction in the Caribbean. Steep hillside terrain, limited road access, and strict environmental regulations demand a contractor who has already solved every problem once. Aquatics International Group has. Our completed private residence on St. John required cutting the pool into solid hillside rock and reusing the excavated stone in the finished architecture, an achievement that defines what our team is capable of in difficult conditions.

Featured Project

A Hillside Estate, Built From the Rock Up

Over one year, our team designed, engineered and built this private estate above the Caribbean. The infinity pool is the centerpiece, but the work covered the whole property: we removed structural columns from the home and installed steel beams to open the views, built an outdoor kitchen and custom woodwork doors, set local St. John stone throughout the hardscape, and finished it with custom handrails, the overlook and a fully custom lighting design.

For hotels and resorts, see resort pool design and construction.

Services

St. John Pool Construction FAQ

How long does a new pool take on St. John?

Most custom pools take six to twelve months from design through completion, depending on the site, the scope and permitting. Our St. John estate took one year from first design to final finish, including the full property work.

Do you renovate existing pools?
Yes. We resurface and retile pools, upgrade equipment and automation, add LED lighting and solar heating, and repair leaks and plumbing. Every renovation starts with a condition assessment so you know exactly what the pool needs.
Can you build on a steep hillside lot?

Yes. Hillside sites are what we do best on St. John. We handle rock excavation, retaining and structural work, and we have cut pools directly into solid hillside rock.

How do crews and materials reach St. John?

Every material, crew member and piece of equipment reaches St. John by barge from St. Thomas. We plan freight, staging and crew logistics before work begins, so your project runs on schedule instead of waiting on the ferry.

How much does a pool cost on St. John?

Every site is different, so we provide a fixed price after a site survey. Contact us to schedule one.

Our Locations

Each market we serve demands a different set of capabilities: different regulations, supply chains, logistical challenges, and client expectations. Aquatics International Group has built the operational infrastructure to deliver exceptional work across all of them.

Let’s Start Your Project

Type
Project Types Filters
Project Locations Filters
Skip to content